Commercial Heat Pump Project | Dublin

DCC Ballyfermot
Joinery Workshop

Industrial Heating Retrofit
Dublin
Exterior of DCC Ballyfermot Joinery Workshop in Dublin
DCC Ballyfermot Joinery Workshop / Dublin
Project DCC Ballyfermot Joinery
Location Ballyfermot, Dublin
Building Industrial Workshop
01 / Project Overview

Project Overview

The DCC Ballyfermot Joinery Workshop is a wood-processing and production facility with adjoining offices in Dublin, covering approximately 4,000m² of heated space.

The project involved replacing an outdated gas-based heating system with a modern Kronoterm heat pump solution, designed to provide reliable, efficient heating for a demanding industrial environment.

02 / The Challenge

The Challenge

The project centred on the installation of a Kronoterm commercial heat pump system, designed to replace the building's existing gas-based heating infrastructure.

The system incorporates three heat pumps operating together, supported by a buffer tank and integrated controls to manage heating demand across the facility.

Along with reliable operation, straightforward system management, redundancy, and space constraints, there was a significant noise consideration. The site backs directly onto a row of residential gardens, so it was critical that the solution be whisper-quiet - a hallmark of KRONOTERM heat pumps, even their larger commercial units!

Interior of the Ballyfermot woodworking and production workshop
The Workshop / Interior
03 / The Solution

The Solution

The project centred on integrating Kronoterm commercial heat pump technology with the building's existing heating infrastructure.

Careful system design and coordination were essential to address the space constraints, accommodate the external buffer tank and ensure the heat pumps could operate effectively alongside the existing boiler system.

The approach prioritised operational reliability, straightforward system control, reduced maintenance requirements and long-term energy performance.

Kronoterm commercial heat pumps installed at Ballyfermot Joinery Workshop
Kronoterm / Commercial Heat Pump Installation
04 / The Outcome

The Outcome

The DCC Ballyfermot project demonstrates how commercial heat pump technology can replace conventional gas heating in an existing industrial building, even where heating demand, noise considerations and operational reliability present significant challenges.

By combining Kronoterm heat pump technology with a carefully considered system design, the project provides an example of how industrial and commercial facilities can transition towards lower-carbon heating while maintaining comfort, control and operational resilience.