West Pier,
Dun Laoghaire
Dublin
Project Overview
West Pier is a modern five-storey commercial office building in Dún Laoghaire, Co. Dublin, with a total floor area of approximately 4,000m².
The project involved integrating a new Kronoterm heat pump system into the building's existing heating infrastructure, delivering a high-performance solution capable of meeting demanding heating requirements while working alongside the existing boiler system.
The Challenge
One of the key challenges was meeting the building's high-temperature heating demands while accommodating the new heat pump system within a very restricted plant room.
With limited internal space available, the project required a carefully considered design that included installing a buffer tank outside the plant room. The new system also needed to integrate seamlessly with the existing boilers to ensure reliable operation and continuity of heating throughout the building.
The Solution
The project centred on integrating Kronoterm commercial heat pump technology with the building's existing heating infrastructure.
Careful system design and coordination were essential to address the space constraints, accommodate the external buffer tank and ensure the heat pumps could operate effectively alongside the existing boiler system.
The approach prioritised operational reliability, straightforward system control, reduced maintenance requirements and long-term energy performance.
The Outcome
The West Pier project demonstrates how commercial heat pump technology can be incorporated into an existing building, even where high heating temperatures, restricted plant room space and complex system integration present significant challenges.
By combining advanced Kronoterm technology with specialist heating system design, the project provides an example of how commercial buildings can transition towards more sustainable heating solutions while maintaining comfort, reliability and operational flexibility.