Residential Heat Pump Project | Wicklow

Yarra Yarra,
Greystones

Residential Heat Pump Installation
Measured Heating Performance
Yarra Yarra residential property in Greystones, County Wicklow
Yarra Yarra / Greystones Residential Heat Pump Project
Project Yarra Yarra
Location Greystones, Co. Wicklow
Performance Reported COP 3.7
01 / Project Overview

Project Overview

Yarra Yarra is a residential heat pump project in Greystones, County Wicklow. The installation demonstrates the potential of air-to-water heat pump technology to provide dependable heating in a residential setting.

The project is particularly notable for its reported heating performance during the first full year of operation, providing an example of how heat pump systems can perform beyond the design stage.

02 / The Challenge

The Challenge

A successful residential heat pump installation requires more than simply selecting equipment. The heating system must be designed around the property's requirements, with attention to comfort, efficiency and everyday operation.

For Yarra Yarra, the objective was to deliver a practical, well-matched heating solution capable of providing reliable performance throughout the year.

03 / The Solution

The Solution

An air-to-water heat pump heating solution was implemented for the Yarra Yarra property, with the system designed to meet the home's heating requirements.

Appropriate system design, installation and operation are central to achieving good real-world performance. The project provides an example of this approach in a residential setting.

ADAPT heat pump installed at Yarra Yarra in Greystones
Yarra Yarra / ADAPT Heat Pump Installation
04 / Heating Performance

Real-World
Results

During its first full year of operation, the Yarra Yarra heating system achieved a reported coefficient of performance (COP) of 3.7.

COP describes the relationship between useful heat delivered and electrical energy consumed. A value of 3.7 indicates approximately 3.7 units of heat delivered per unit of electricity consumed over the reported measurement period.

3.7 Reported Coefficient of Performance First full year of operation
05 / The Outcome

The Outcome

Yarra Yarra provides an example of a residential heat pump installation with reported operational performance.

The first-year COP of 3.7 illustrates the value of appropriate heating system design and installation, together with an understanding of how the system performs during everyday use.

The project contributes to Glenergy's residential portfolio, demonstrating the application of heat pump technology in homes across County Wicklow.